久久亚洲国产成人影院-久久亚洲国产的中文-久久亚洲国产高清-久久亚洲国产精品-亚洲图片偷拍自拍-亚洲图色视频

  Home>News Center>China
       
 

China to build two new nuclear plants
By Wang Ying (China Daily)
Updated: 2005-12-27 06:42

Following the operational start-ups of 11 nuclear reactors in the south and east, China next year will begin building two nuclear plants which contain two reactors each, in Northeast China's Liaoning Province and East China's Shandong Province.

The Liaoning plant, consisting of two 1,080-MW (megawatt) reactors, will cost US$2.8 billion. It will be the first nuclear base in Northeast China, located at Hongyanhe, the coastal city of Dalian, a senior official from China Guangdong Nuclear Power Group (CGNPG) said.

"We expect to get the final go-ahead (to build the Dalian nuclear plant) from the National Development and Reform Commission (NDRC) by the end of this year," said the official, who did not want to be identified.

CGNPG sources last week said that they plan to start the Dalian project as soon as possible.

The Dalian nuclear plant is scheduled to generate electricity in 2011, the company official said.

CGNPG plans to begin infrastructure construction and design at the Dalian plant within this month, the official said.

According to the investment agreement for the new project in Dalian, CGNPG and China Power Investment Corp (CPI) will each control a 45 per cent stake. The remaining 10 per cent will be equally divided between local companies Liaoning Energy Investment Group and Dalian Construction Investment Co, the CGNPG official said.

For the plant in Shandong Province, CPI has reached an initial agreement with the country's biggest nuclear plant constructor, China National Nuclear Corp (CNNC), to jointly build a nuclear plant at Haiyang.

The Haiyang plant, which contains two 1,000-MW reactors, will process at the same pace as the Dalian plant, CPI director Liu Changqing told China Daily yesterday.

"We have submitted the feasibility study to the NDRC," Liu said.

The Chinese Government has included both projects at Dalian and Haiyang in the country's 11th Five-Year Plan (2006-2011), a CNNC spokesman said last week.

Further details were not available for the Haiyang plant in Shandong.

The Dalian plant will cost less than the previous reactors, since CGNPG will use China's own nuclear technology CPR 1000 in designing the new reactors. This is based on technology adopted in the second phase of the Ling'ao nuclear project in South China's Guangdong Province.

The new reactors at the Dalian plant are expected to cost US$1,300 per kilowatt, compared with the US$1,500 per kilowatt for the Ling'ao phase II, which launched construction earlier this month and contains two 1,000-MW reactors.

"We will be very competitive in the sale prices due to the lower costs," the CGNPG said.

Coal-fired plants, which installed desulphurization facilities, sell their electricity to grid companies at 0.347 yuan (4.28 US cents) per kilowatt-hour in Dalian, according to the CGNPG official.

In order to cut pollution caused by the burning of coal, which fuels more than 70 per cent of the country's electricity generators, the government ordered all the installation of desulphurization equipment in China's coal-fired plants to eliminate sulphur pollutants.

"We can make profit at the same price with these coal-fired plants," the company official said.

Equipment manufacturing and procurement for the new Dalian plant will be open for bid among domestic suppliers, with a small proportion expected to come from foreign companies, the CGNPG official said.

"Domestic suppliers will produce 80 per cent of the equipment including the generation turbines designed for the new plant," he said.

CPI sources earlier said that as many as 10 reactors would be built at the two coastal places in Liaoning and Shandong, with six built at Dalian and four at Haiyang.

Currently, only CNNC and CGNPG are authorized to build nuclear plants in China. Other power companies, including CPI, will only be allowed a stake in the nuclear plant if they intend to participate in the nuclear sector.

Foreseeing great potential in nuclear energy, CGNPG, based in Guangdong, is also planning two more nuclear plants at two places called Taishan and Lufeng in the province.

"Another in the neighbouring Guangxi Zhuang Autonomous Region is also under study," the CGNPG official said.

(China Daily 12/27/2005 page9)



Harbin Ice & Snow World
Two-year old mother and its 13 doggy babies
Bar fire leaves 26 dead, 11 wounded in Guangdong
  Today's Top News     Top China News
 

Treatment for human infection of bird flu developed

 

   
 

US$35.8 billion of funds abused this year

 

   
 

China and Japan discuss UN reform

 

   
 

Family of three die in suspected suicide blast

 

   
 

Law to curb gov't power over house relocation

 

   
 

Accident cash funds set up by coal mines

 

   
  Christmas Day bar fire kills 26 in China
   
  China, Japan talks on UN reform highlight rift
   
  Four new Party secretaries appointed
   
  Contaminated water returning to safe level
   
  Mainland's top cross-Straits negotiator dies
   
  NPC moves to abolish agricultural tax
   
 
  Go to Another Section  
 
 
  Story Tools  
   
  News Talk  
  It is time to prepare for Beijing - 2008  
Manufacturers, Exporters, Wholesalers - Global trade starts here.
Advertisement
         
主站蜘蛛池模板: 成人小视频在线观看免费 | 一级毛片看一个 | 欧美亚洲日本一区二区三区浪人 | 手机看片国产免费 | 在线日本看片免费人成视久网 | 欧美成人综合在线观看视频 | 中文字幕123区 | 国产久草视频 | 成人欧美网站免费 | 岛国毛片在线观看 | 久久久久99精品成人片三人毛片 | 九色国产在线 | 毛片免费在线视频 | 米奇777第四久久久99 | 91成人免费观看网站 | 99在线观看视频免费精品9 | 丝袜黄色片 | 欧美人交性视频在线香蕉 | 热99re久久国超精品首页 | 免费看黄色三级毛片 | 国产高清在线精品二区一 | s8国产成人精品视频 | 真人真实毛片免费观看 | 收集最新中文国产中文字幕 | a级毛片在线播放 | 成年人看的黄色片 | 亚洲欧洲一区二区 | 国产成人cao在线 | 真正免费一级毛片在线播放 | 欧美一级毛片一 | 国产精品一区二区国产 | 免费a黄色 | 欧美一级在线看 | 国产在线观看精品一区二区三区91 | 国产区更新 | 久久伊人男人的天堂网站 | 一级在线观看视频 | 国产欧美综合精品一区二区 | 亚洲美女在线观看亚洲美女 | 欧美一级毛片免费播放器 | 国产成人啪精品 |